
First, safely remove the bit from the drill—use a cloth or gloves to avoid direct contact with the overheated metal. Inspect the bit for any visible damage such as discoloration or warping. If the bit appears to be damaged, it’s best to replace it..
First, safely remove the bit from the drill—use a cloth or gloves to avoid direct contact with the overheated metal. Inspect the bit for any visible damage such as discoloration or warping. If the bit appears to be damaged, it’s best to replace it..
Stop Using the Drill: As soon as you notice the drill overheating, stop using it immediately. Continuing to use it can cause damage to the tool and increase safety risks. Disconnect Power: Unplug the drill from the power supply..
Overheating in drills is more serious than it sounds, and you should know the correct ways to fix your tool fast. The easiest and most common ways to cool down the drill include changing the drill bit and lubricating it. It is likely time to change your drill bit when it gets full.
[pdf] 
Check the fuse, motor, and thermal relay and other equipment. Ensure that these devices are in a normal operating state. If there are problems or hidden dangers, relevant measures need to be taken to replace these devices in time. Check the pressure and temperature sensor and start button..
Check the fuse, motor, and thermal relay and other equipment. Ensure that these devices are in a normal operating state. If there are problems or hidden dangers, relevant measures need to be taken to replace these devices in time. Check the pressure and temperature sensor and start button..
A screw compressor can run loaded ('pumping air') or unloaded ('idle'). The inlet/loading valve opens and closes according to air demand. The inlet valve is controlled by a solenoid valve that supplies control air to the inlet/loading valve. Check solenoid valve coil and solenoid valve operation..
The main causes involve improper slide valve positioning, component wear, insufficient voltage, pipeline vibrations, and inadequate oil levels..
The inlet valve is controlled by a solenoid valve that supplies control air to the inlet/loading valve. Check solenoid valve coil and solenoid valve operation. First, check that there isn’t a very high air demand, or air leak somewhere. Check differential pressure over oil separator.
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf]