The anchoring drilling rig is mainly used in the landslide and dangerous rock mass anchoring projects in the prevention and control of various geological disasters in hydropower stations, railways and highway slopes, especially suitable for high slope rock mass anchoring projects, and also suitable for construction of urban deep foundation pit support, anti-floating For bolts and foundation grouting reinforcement engineering holes, blasting holes for blasting engineering, high-pressure jetting piles, tunnel pipe shed support holes, etc., the power head can be slightly changed to facilitate all-round construction.
[pdf] 1. Oil, gas, and mineral resources exploration 2. Engineering geological prospecting 3. Hydrological well exploration 4. Borehole in surface blasting 5. Gallery ventilation The crawler core full hydraulic drilling machine is a new type of integrated drilling rig developed on the basis of YG research and development of. .
(1) Full hydraulic drive, easy to operate; (2) Modular design, each component module is easy to assemble and disassemble. Also, it is convenient to derive series products, reduce the. .
Why do more and more people prefer to use crawler fully hydraulic core drilling rigs? There is no doubt that this is a good choice for operators.
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf]