METHOD STATEMENT FOR INSTALLATION AMP TESTING OF EARTHING

Roman Diesel Down-the-Hole Drilling Rig Method

Roman Diesel Down-the-Hole Drilling Rig Method

A down-the-hole drill, usually called DTH by most professionals, is basically a jackhammer screwed on the bottom of a drill string. The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or drilling mud). The DTH hammer is one of the fastest ways to drill hard rock. The system is thought to have been invented independently by Stenuick. Origin of the nameDTH is short for “down-the-hole”. Since the DTH method was originally developed to drill large-diameter holes downwards in surface-drilling applications, its name originated from the fact that the percussion mechanis. . In DTH drilling, the percussion mechanism – commonly called the hammer – is located directly above the drill bit. The drill pipes transmit the necessary feed force and rotation to the hammer and the bit, along with the flui. [pdf]

Screw air compressor pressure gauge inspection method

Screw air compressor pressure gauge inspection method

1-1 Scope of Application This document covers procedures and methods of tests, examinations and inspections to be performed to the Screw Compressor which has been manufactured and supplied by screw compressor vendors. 1-2 Purpose of Examination and lnspection The purpose of the examinations. . 2-1Genaeral General descriptionon examinations/inspections to be performed on the compressor proper and the relatedparts are mentioned in this chapter. The inspection itemsof each major part are shown in inspection and test plan. 2-2Material Inspection. . After completion of the test, the rotors and the rotor chamber will be visually inspected through the discharge nozzle. (The discharge side is under most severe conditions, and the visual inspection of the discharge side is a normal practice to check a rotor. . Following Items are measured in Heat Run, Mechanical Run and Performance Test: 1. Atmospheric Pressure 2. Atmospheric Temperature 3. Relative Humidity (Only in Performance Test) 4. Inlet Pressure 5. Inlet Temperature 6. Discharge Pressure. . Following componenets are used for test from Shop Facilities: 1. Driver( Motor) 2. Couplings 3. Baseplate 4. Suction Filter 5. Suction Silencer 6. Discharge Silencer 7. Lube Seal Oail Unit (Include Oil Reservoir) 8. Piping 9. Instruments 10. Thrust Bearing T em perature. [pdf]

Screw air compressor valve maintenance method

Screw air compressor valve maintenance method

A screw air compressor is very similar to a human heart. While a human heart has tricuspid, pulmonary, mitral, and aortic valves, a screw air compressor has four critical valves namely air inlet, minimum pressure, blow down, and safety valves. Air inlet valveis also commonly known as the ‘Intake valve’ which is. . Though each compressor manufacturer has their own unique valve design, compressor valves in general contain moving parts such as springs, valve plates, and plungers that affect the opening and. . Many times, it is difficult to identify a malfunctioning valve or a valve operating with worn-out parts as the compressor continues to generate air. The typical symptoms of a malfunctioning valve. . It is difficult or almost impossible to identify a malfunctioning valve unless it is opened for inspection. Hence it is absolutely mandatory that these valves are inspected for effectiveness every year and the internal moving parts replaced as a part of preventive maintenance once every year or two depending on the operating conditions of the air c. . As stated before, it is challenging to identify a valve that is worn out unless it is opened and inspected, but there are a few indicators that a qualified compressor technician can use to deduct a malfunctioning valve. Based on Operating Conditions 1. Low duty cycle operation:A sophisticated screw air compressor in today’s day and age carries a co. [pdf]