1-1 Scope of Application This document covers procedures and methods of tests, examinations and inspections to be performed to the Screw Compressor which has been manufactured and supplied by screw compressor vendors. 1-2 Purpose of Examination and lnspection The purpose of the examinations. .
2-1Genaeral General descriptionon examinations/inspections to be performed on the compressor proper and the relatedparts are mentioned in this chapter. The inspection itemsof each major part are shown in inspection and test plan. 2-2Material Inspection. .
After completion of the test, the rotors and the rotor chamber will be visually inspected through the discharge nozzle. (The discharge side is under most severe conditions, and the visual inspection of the discharge side is a normal practice to check a rotor. .
Following Items are measured in Heat Run, Mechanical Run and Performance Test: 1. Atmospheric Pressure 2. Atmospheric Temperature 3. Relative Humidity (Only in Performance Test) 4. Inlet Pressure 5. Inlet Temperature 6. Discharge Pressure. .
Following componenets are used for test from Shop Facilities: 1. Driver( Motor) 2. Couplings 3. Baseplate 4. Suction Filter 5. Suction Silencer 6. Discharge Silencer 7. Lube Seal Oail Unit (Include Oil Reservoir) 8. Piping 9. Instruments 10. Thrust Bearing T em perature.
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf] 1. Oil, gas, and mineral resources exploration 2. Engineering geological prospecting 3. Hydrological well exploration 4. Borehole in surface blasting 5. Gallery ventilation The crawler core full hydraulic drilling machine is a new type of integrated drilling rig developed on the basis of YG research and development of. .
(1) Full hydraulic drive, easy to operate; (2) Modular design, each component module is easy to assemble and disassemble. Also, it is convenient to derive series products, reduce the. .
Why do more and more people prefer to use crawler fully hydraulic core drilling rigs? There is no doubt that this is a good choice for operators.
[pdf]