1. Oil, gas, and mineral resources exploration 2. Engineering geological prospecting 3. Hydrological well exploration 4. Borehole in surface blasting 5. Gallery ventilation The crawler core full hydraulic drilling machine is a new type of integrated drilling rig developed on the basis of YG research and development of. .
(1) Full hydraulic drive, easy to operate; (2) Modular design, each component module is easy to assemble and disassemble. Also, it is convenient to derive series products, reduce the. .
Why do more and more people prefer to use crawler fully hydraulic core drilling rigs? There is no doubt that this is a good choice for operators.
[pdf] XZ2860/XZ2860Plus adopts steel track self-walking chassis with strong adaptability,high reliability;World famous reducer with strong stability and good quality .
Choosing Cummins turbo charged engine. Powerful and Meet the National II/III (Standard) stage emission standards. .
According to the characteristics of the HDD trenchless rig, it apply advanced intelligent control technology, CAN bus technology, clear showed instrument. Using large size, high resolution monitor. Automatic show the actual push&pull force and rotary torque.. .
Rotation adopts closed hydraulic system.Push&pull adopts loading sensitive control system.Imported components with reliable quality. .
Front rocker arm and rear supporting cylinder amplitude of variation at the same time. Angle adjustment is easy and large range.. Drill frame is made of high strength steel welded. The standard for drill pipe bracket. The drill pipe can support automatic centering..
[pdf] 1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling upward, downward, or inclined holes, the width of the cavity is. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper.
[pdf]